CURRENT PROJECTS

Your vision is our mission, at Paradox Building and Design we apply construction methodology and value engineering to your project to ensure a high quality aesthetically pleasing project is delivered in a quick succession whilst protecting your bottom line.

Gowrie Early Learning
Mckail
Research and Development Centre Bentley
Residential Redevelopment Balga
KFC inline fit out South
Waterloo
KFC - National roll out
Kwench
  • Design and Construct

  • Site area – 3302m2

  • GFA – 552 m2

  • Placements - 92

  • Carpark – 1500m2

  • Construction time – 25 weeks

  • Design and Construct

  • Site area – 1140m2

  • GFA – 410m2

  • Placements 51

  • Carpark – 390m2

  • Construction time – 24 weeks

KFC inline fit out North
Waterloo
  • Turnkey fit out to operational trade

  • GFA – 160m2

  • Construction time – 6 weeks

  • Turnkey fit out to operational trade

  • GFA – 160m2

  • Construction time – 6 weeks

Paradox Building and Design have been engaged to undertake site survey of existing stores including design assistance across 30 metro and 8 reginal stores to make way for the new Kwench drink line equipment. The construction servicing for these projects includes permitting, demolition and construction of proposed areas in operational stores. Construction time – 3 days per store.

  • Design and construct

  • Site area – 728m2

  • Development of 2, 3 bed 2 bath 2 car garage villas and 1, 4 bed 3 bath 2 car garage town house

  • Construction time 26 weeks

Your vision is our mission

Ready to discuss your commercial or custom residential project? We align with your vision from day one.